Welcome to Leonard Luxury Homes. This site is dedicated to showing the work we have been involved with over the last 4 years in Residential Construction, directly as the contractor or indirectly as a subcontractor. The principle, Robert Leonard has more than fifteen years of comprehensive experience in construction management, project management, engineering management and CAD operations. Assignments have been concentrated in the areas of new construction and renovation projects in manufacturing plants and hotels. Robert has a BS Degree in Industrial Technology.

Folly Beach Holiday Inn

Called at the last minute by the Architect to help out building a concrete countertop for an outside bar. With the help of Charleston Concrete Design, built a 1 1/2" thick top 24" wide with 5" drinkrail, 4" turned down front and 3" turned down back. 84 total sq. ft. of bartop. Formed, poured, sanded, finished and sealed in 6 days. Built the forms on Sat, poured the concrete on Sunday, and broke the molds on Weds. Sanded, and finished on Thursday, sealed on Friday.







Mold Photo, Typical


Rough Concrete, Typical


Final Concrete, Typical































Private Residence, Mt. Pleasant

Have done several different jobs for this home. Continuing to update the features of the house to fit the needs of the homeowner. Started with a new game room added to the garage area of the home. Added a custum built armoire to create more closet space in Master Bedroom. Added custum built-ins to an upstairs tv room to create display space and storage. Built a new window desktop in a dormer space. Remodeled upstairs and downstairs bathrooms. Replaced existing pressure treated steps with longer lasting epei steps. Screened in downstairs garage area to make more comfortable from bugs in the summer months.

































DOWNSTAIRS BATHROOM













Hrizik Kitchen Remodel


Removed existing walls and cabinets, added new beam to span kitchen opening. Built new wall to accept cabinets. Installed new cabinets, countertops and cabinet lights. Reworked existing lighting and added new lights over bartop. Installed new ceiling fans and crown molding to finish out work.



Before

After

Before

After

Before


After

Before



After


Before

After

Before


After

After

After


After




ADC Engineering

Specialty Commercial Job. Custom built steps designed by architect. High gloss polish of concrete reception desk. Rough grinding of front of reception desk.

Finished Stairs

Reception Desk Top Before

Reception Desk Top After

Reception Desk Before


Reception Desk After


Lobby to Landing Before

Lobby to Landing After

Landing to Second Floor Before


Landing to Second Floor After


Landing Before


Landing After